Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the benqu-extension domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /DATA/k3596128/public_html/tertorial_v2/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-stats-manager domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /DATA/k3596128/public_html/tertorial_v2/wp-includes/functions.php on line 6121
JORR - Teritorial.Com
Nasional

Integrasi JORR Akan Diberlakukan Efektif Mulai 20 Juni 2018

Bekasi, Teritorial.com – Dalam rangka meningkatkan edukasi kepada pengguna jalan tol. Badan Pengatur Jalan Tol Kementerian Pekerjaan Umum dan Perumahan Rakyat (BPJT-Kementerian PU-Pera) bersama dengan Badan Usaha Jalan Tol (BUJT) pengelola ruas Jakarta Outer Ring Road (JORR) sepakat untuk menambah waktu sosialisasi dalam rangka integrasi JORR. Sebagaimana info sebelumnya, bahwa sesuai dengan Surat Keputusan Menteri […]